A long process of refitting the Admiral Kuznetzov aircraft carrier in Space Engineers to achieve faster than light travel. This is an open Space Engineers server and anyone is welcome to join. Opera: Signal Corps (cross-play supported)

Originally built by the Black Sea Shipyard of Ukraine: Ordered 3 March 1981 Builder Nikolayev South Laid down 1 April 1982 Launched 6 December 1985 Commissioned 20 January 1991 (fully operational in 1995)

The ship has been out of service and in repairs since 2018. The repair process has been hampered by accidents, embezzlement of funds, and other setbacks. After the floating drydock PD-50 sank in Kola Bay (Murmansk) in an accident that killed one worker in October 2018, the ship was towed to Sevmorput Yard No 35. In another mishap in December 2019, a major fire killed at least one worker and injured ten others. In June 2022, the ship was transferred to a drydock at the 35th Ship Repair Plant in Murmansk, where it remained until February 2023. The current projection is that repairs will be completed and the ship will be transferred back to the Russian Navy sometime in 2024, however this may be pushed back to 2025 if issues arise during overhaul and testing.

Videos